Enguri Dam

technology Maturity 11-13 Next article →

The Enguri Dam is a huge structure in Georgia.

Enguri hydropower plant scheme
Enguri hydropower plant scheme

It sits on the Enguri River near the town of Jvari. This dam is a concrete arch dam. An arch dam is curved like a bow. It is currently the second highest of its kind in the world. This dam is part of a larger power station. This station helps provide electricity to many people. It is a very important part of how the country works.

This dam uses water to make electricity. This is called hydroelectric power. The power station uses many different parts to work. It has 20 turbines to make energy. A turbine is a machine that spins to create power. Each turbine has a capacity of 66 MW. This makes a total capacity of 1,320 MW. The station is a cascade of many different facilities. These include the main dam and several smaller installations.

Enguri hydropower plant scheme
Enguri hydropower plant scheme

Building the dam was a long project. Work first began in the year 1961. The dam became operational in 1978. It was fully completed in 1987. Before this, Nikita Khrushchev wanted a dam on the Bzyb River. His experts said a dam there would cause beach erosion. This means the sand on the beach would wash away. So, they chose the Enguri River instead. The impact on the coast would be much less.

Enguri hydropower plant scheme
Enguri hydropower plant scheme

Many groups have helped keep the dam working. In 1994, engineers found the dam was in a bad state. The European Commission gave €9.4 million for urgent repairs in 1999. This helped fix a part called the stoplog. Other groups like the EBRD and the European Union also gave loans. In total, €116 million in loans were granted. Later, in 2011, the European Investment Bank gave €20 million. This money helped finish the rehabilitation of the plant.

Enguri hydropower plant scheme
Enguri hydropower plant scheme

The dam and the power station are in different places. The dam is in Upper Svanetia. However, the power station is in the Gali District of Abkhazia. In 2007, the station made about 46% of Georgia's electricity. By a 1992 agreement, Abkhazia gets 40% of the power. The rest goes to Georgia. In 2015, the dam became a piece of cultural heritage. This means it is a special part of Georgia's history.

Enguri hydropower plant scheme
Enguri hydropower plant scheme
373 words

Where will your curiosity go next?

Keep exploring at your chosen reading level.

🖼️ Images & Media (1)
File:Enguri hydropower plant scheme.jpg
Enguri hydropower plant scheme.jpg
More to explore

🔬 Go deeper

More advanced topics to explore

🪜 Step back

Simpler topics to build understanding

What is Nepedia?

A free, ad-free encyclopedia for children. Every article is written at five reading levels, so the same page works for a five-year-old and a fifteen-year-old — use the level switcher above to see this one change. No account needed to read.