Guri Dam

technology Maturity 11-13 Next article →

The Simón Bolívar Hydroelectric Plant is a massive energy facility in Venezuela. It is also known as the Guri Dam or Represa de Guri. This structure is a concrete gravity and embankment dam. It sits on the Caroní River within Bolívar State. The dam is vital because it creates the Guri Reservoir. This reservoir is one of the largest on Earth. It is also the largest fresh water body in Venezuela.

Embalse Guri
Embalse Guri

This dam functions by generating hydroelectric power. This process uses the movement of water to create electricity. The reservoir holds a massive amount of water behind the dam. When water flows through the plant, it turns large machines called turbines. The spinning turbines generate power for the electrical grid. The plant has two main sections called powerhouses. Powerhouse I originally used ten turbines to generate electricity. In 1976, a second building stage began to meet rising demand. This added a second powerhouse with ten more turbines. Each of these new turbines has a capacity of 725 megawatts (MW). A megawatt is a unit used to measure electrical power.

The dam has grown in size and complexity over many decades. The original structure was completed in 1969. At that time, the plant had a combined capacity of 1750 MW. By 1978, the capacity reached 2065 MW. The dam is 7,426 metres long and 162 metres high. After the second expansion, the water level rose to 272 metres above sea level. The reservoir can hold 138 billion cubic metres of water for flood storage. This large volume helps manage floodwater evacuation. The second part of the structure was officially inaugurated on 8 November 1986.

History shows how much planning went into this massive project. Technical feasibility studies began in 1961. These studies were conducted by the Harza Engineering Company. An international consortium of six firms won the contract to build the plant. This group included four companies from the United States. Construction started in 1963 in the Necuima Canyon. This canyon is located 100 kilometers upstream from the mouth of the Caroní River. The plant was originally named the Raúl Leoni Hydroelectric Plant. It was later renamed the Simón Bolívar Hydroelectric Plant.

The dam is a cornerstone of the Venezuelan energy system. Venezuela uses a policy to minimize power from fossil fuels. This allows the country to export as much oil as possible. Because of this, 74% of the nation's electricity comes from renewable energy. Hydroelectric power is a primary source of this renewable energy. The Guri Dam alone supplies more than one third of Venezuela's electricity. Some of this generated power is even exported to Brazil and Colombia. This makes the dam a key part of the regional energy network.

However, relying so heavily on one source carries significant risks. The plant depends entirely on the water levels in the reservoir. In 2010, a prolonged drought caused water levels to drop too low. This meant the dam could not produce enough electricity for everyone. The government had to impose rolling blackouts to manage the shortage. A similar situation happened in April 2016. During that time, the government announced blackouts of four hours every day. These restrictions lasted for 40 days until the water levels stabilized.

In March 2019, the plant experienced a major failure. On 7 March, the Simón Bolívar Hydroelectric Plant failed completely. This left most of Venezuela's 32 million citizens in the dark. The failure affected the San Gerónimo B substation. This specific substation distributes 80% of the country's electricity. Officials tried to restart it four times, but all attempts failed. Government officials called the event an act of sabotage. However, many experts believe the failure was due to aging infrastructure. They suggest the plant suffered from insufficient maintenance over the years.

629 words

Where will your curiosity go next?

Keep exploring at your chosen reading level.

🖼️ Images & Media (1)
File:Embalse Guri.JPG
Embalse Guri.JPG
More to explore

🔬 Go deeper

More advanced topics to explore

🪜 Step back

Simpler topics to build understanding

What is Nepedia?

A free, ad-free encyclopedia for children. Every article is written at five reading levels, so the same page works for a five-year-old and a fifteen-year-old — use the level switcher above to see this one change. No account needed to read.