A long train track goes across the desert. 
A long train track runs across a dry desert. 

The Trans-Australian Railway is a very long train track. 


The Trans-Australian Railway is a vital rail path across the desert. 

Building the railway was a massive job that took many years. In 1901, the Australian colonies joined to form a single nation. At that time, Perth was isolated from other states by thousands of kilometres of desert. People had to travel by sea across the rough Great Australian Bight. To fix this, leaders promised a railway to link the continent. Work started in Port Augusta in September 1912. 
Early engineers faced many hard jobs while running the trains. Steam locomotives needed a lot of water to work. However, the water in the desert bores had a high salt content. This salt caused major damage to the engine boilers. In fact, boiler repairs made up 87 per cent of all maintenance. To fix this, workers used barium carbonate water treatment plants. Later, the railway switched to diesel-electric locomotives in 1951. 
As time passed, the railway changed to make travel easier. Until 1970, the tracks at each end used a different width. This was called a narrow gauge. In 1970, a project made the whole line a standard gauge. This meant trains could travel from Sydney to Perth without stopping.
Today, people use the railway for more than just moving goods. Two special passenger services offer amazing trips through the desert. One is called the Indian Pacific, which travels the entire length.
The Trans-Australian Railway is a massive rail link across the Australian continent. 

The history of the railway is tied to the birth of the Australian nation. In 1901, the six Australian colonies federated to form the Commonwealth of Australia. At that time, Perth was isolated from the other states by thousands of kilometres of desert. The only practical way to travel was by sea. This required voyages across the rough Great Australian Bight. These trips were often time-consuming and uncomfortable. To encourage Western Australia to join the federation, leaders promised a federally funded railway. In 1907, legislation allowed for a route survey. The survey was finished in 1909 and suggested a path through Tarcoola. Construction officially began in Port Augusta in September 1912. 
Building the track was a monumental feat of engineering. Work proceeded from both ends toward the middle. Crews moved eastwards from Kalgoorlie and westwards from Port Augusta. This work continued through the years of the First World War. At its peak, workers laid 11 miles of track in a single day. This remains an Australian tracklaying record. By 1915, the two ends of the line were only 110 miles apart. The two halves finally met at Ooldea on 17 October 1917. The total cost was estimated at £4,045,000. In modern terms, this is equivalent to roughly $800 million.
Operating the railway in a desert presented unique mechanical challenges. Early trains used steam locomotives, which require large amounts of water. However, the water found in desert bores had a high mineral salt content. This salt caused severe damage to the locomotive boilers. In fact, boiler repairs accounted for 87 per cent of all locomotive maintenance. Engineers eventually solved this by using barium carbonate water treatment plants. 
The railway has also undergone significant changes in its track structure. For many years, the line used different track widths at each end. These were known as narrow-gauge lines. This meant passengers and freight had to change trains to continue their journey. In 1970, a major project completed the standardisation of the line. This turned the railway into a key part of the Sydney–Perth rail corridor. By 2004, the standard-gauge connection between all mainland state capitals was finally closed. This was achieved through connections between Port Pirie, Adelaide, and Melbourne.
Today, the railway is used for both heavy freight and special tourism. Two major passenger services operate on the line. The Indian Pacific is an experiential tourism service that travels the entire length of the railway. The Ghan is another service that runs between Port Augusta and Tarcoola. From Tarcoola, The Ghan leaves the line to head north toward Darwin.
Maintaining such a long line in a harsh environment requires modern technology. The railway uses crossing loops to allow trains to pass one another. These loops are at least 1,500 meters long and spaced about 30 miles apart. Many of these loops are unattended. Train crews use radio controls to set the track points as they approach. Some locomotives even use an activated points system (ICAPS) to set the route without stopping. 
🖼️ Images & Media (6)
More to explore
✨ What else?
Related topics you might enjoy
🔬 Go deeper
More advanced topics to explore
🪜 Step back
Simpler topics to build understanding
What is Nepedia?
A free, ad-free encyclopedia for children. Every article is written at five reading levels, so the same page works for a five-year-old and a fifteen-year-old — use the level switcher above to see this one change. No account needed to read.