Øresund Bridge

technology Maturity 5-7 Next article →

The Øresund Bridge is a massive combined railway and motorway cable-stayed bridge.

Øresund Bridge from the air in September 2015
Øresund Bridge from the air in September 2015

It spans the Øresund strait, which separates Denmark and Sweden. This structure is the second longest bridge in Europe. It serves a vital role by connecting the Scandinavian Peninsula to mainland Europe. The bridge carries the international European route E20 for cars. It also carries the Øresund Line for trains.

Oresundsbron jarnvag 20140515 0252 (14379975915)
Oresundsbron jarnvag 20140515 0252 (14379975915)

Beyond transport, a data cable makes it a backbone for internet transmission between Sweden and central Europe.

The Øresund Link is a complex system of different parts.

Øresund Link Diagram
Øresund Link Diagram

It begins by running from the Swedish coast toward the middle of the strait. There, it reaches an artificial island called Peberholm. This island was created by people to connect the different sections. From Peberholm, the link changes from a bridge into the Øresund Tunnel. This tunnel travels underwater to reach the Danish island of Amager.

Oresund tunnel2
Oresund tunnel2

Engineers chose this specific design for several important reasons. A tunnel prevents the structure from interfering with air traffic from Copenhagen Airport. It also ensures a clear channel for ships and prevents ice floes from blocking the strait.

Designing the bridge required choosing between different routes and structures.

ORESUNDBRIDGE WIDE
ORESUNDBRIDGE WIDE

One option was a link between Helsingør and Helsingborg. However, planners decided to prioritize the connection between the major cities of Copenhagen and Malmö. The final design used a two-level approach. The ASO Group proposed a steel bridge with the highway on top and the railway below.

This design was selected over a concrete bridge design that placed both paths on the same level. The construction involved many different contracts for access bridges and the main span.

Ideas for a fixed link across the strait have existed for over a century. In the late 1800s, people began discussing ways to connect the lands. As early as 1910, proposals were made to the Swedish Parliament for a railway tunnel. In 1936, a group of engineering firms proposed a national motorway network. Various government commissions studied the project through the 1950s and 1960s. A formal agreement between Denmark and Sweden was signed in 1973, but it was cancelled in 1978. This cancellation happened because of the economic situation and environmental concerns. A new agreement was finally signed in 1991 to move forward.

Construction began in 1995 and was managed by Sundlink Contractors.

Øresund Bridge from Copenhagen
Øresund Bridge from Copenhagen

The project faced several unexpected challenges during this time. Workers discovered 16 unexploded World War II bombs on the seafloor. They also dealt with a tunnel segment that was accidentally skewed. Despite these setbacks, the link was finished three months ahead of schedule. The official dedication took place on 1 July 2000.

Øresund Bridge
Øresund Bridge

This ceremony was hosted by Queen Margrethe II of Denmark and King Carl XVI Gustaf of Sweden.

The bridge is built to meet extremely high safety and engineering standards. It is designed to have a lifespan of at least 100 years. The structure must withstand high wind speeds of 61 meters per second. The piers are designed to withstand collision forces of 210 MN. The spans must also withstand forces of 35 MN from collisions. The bridge can handle fast passenger trains and heavy freight trains. It must also remain stable during earthquakes. These strict requirements ensure the bridge remains safe for all users over many decades.

To build such a large structure, engineers used specialized tools. One decisive factor was the use of the Svanen, the world's largest hammerhead crane barge. Because the Svanen had such a large lifting capacity, engineers could increase the length of the spans. They increased the spans from the original plan to 140 meters. This allowed them to use fewer piers, which helped keep the water flow through the Sound unaffected. The project also used the Eurocodes, which were then new European standards for structural design. This helped different subcontractors from many countries work together effectively.

640 words

Where will your curiosity go next?

Keep exploring at your chosen reading level.

🖼️ Images & Media (19)
File:Øresund Bridge from the air in September 2015.jpg
Øresund Bridge from the air in September 2015.jpg
File:Øresund Bridge, Öresundsbron.jpg
Øresund Bridge, Öresundsbron.jpg
File:Øresund Bridge from Copenhagen.jpg
Øresund Bridge from Copenhagen.jpg
File:ORESUNDBRIDGE_WIDE.jpg
ORESUNDBRIDGE_WIDE.jpg
File:Oresund-over-2008.JPG
Oresund-over-2008.JPG
File:Øresund Link Diagram.svg
Øresund Link Diagram.svg
File:20191216 Oresundsbron fran Hyllie 0083 (49229769877).jpg
20191216 Oresundsbron fran Hyllie 0083...
File:20191107 Oresundsforbindelsen 0271 (49042749191).jpg
20191107 Oresundsforbindelsen 0271...
File:20190613 Fågelliv på Pepparholm (48060095562).jpg
20190613 Fågelliv på Pepparholm (48060095562).jpg
File:Oresund tunnel2.svg
Oresund tunnel2.svg
File:Oresund.ASTER.20040410.jpg
Oresund.ASTER.20040410.jpg
File:Øresund Bridge Road Traffic.svg
Øresund Bridge Road Traffic.svg

+ 7 more

More to explore

What is Nepedia?

A free, ad-free encyclopedia for children. Every article is written at five reading levels, so the same page works for a five-year-old and a fifteen-year-old — use the level switcher above to see this one change. No account needed to read.