A big bridge joins two lands.
It carries cars and trains. It goes over the sea. This helps people travel fast. It is a very long bridge.
Can you see the trains?
A big bridge joins two lands.
It carries cars and trains. This bridge goes over the sea. It connects Denmark and Sweden.
The bridge has a road on top. Trains run on the bottom. It also has a tunnel. The tunnel goes under the water.
A man-made island helps the bridge. It is called Peberholm. This island sits in the middle. It helps the bridge reach the other side.
People use the bridge to travel. They can drive or take a train. It helps people visit new places. It is a very long bridge.
The Øresund Bridge connects Denmark and Sweden.
It is a very long link. It carries both cars and trains. This is done in one big structure. The road sits on top. The railway runs on the bottom.
The bridge does not go all the way across the water. It uses a tunnel to reach Denmark.
The bridge goes to an artificial island. We call this island Peberholm. It was made by people. From Peberholm, the tunnel goes under the sea to the island of Amager.
Engineers had to make smart choices. They used a tunnel to keep the sky clear. This helps planes fly at the nearby airport. It also keeps the water open for big ships. The bridge can stay strong for 100 years. It can even handle fast trains and high winds. Construction began in 1995. It opened to the public on 1 July 2000.
The Øresund Bridge is a massive link between Denmark and Sweden.
It is the second longest bridge in all of Europe. This structure is special because it carries two different paths at once. One path is for cars on the E20 motorway. The other path is for trains on the Øresund Line.
By joining these two lands, it connects Scandinavia to the rest of Europe. It even carries a data cable to help send internet information.
The way the link works is quite clever. It does not just stay above the water the whole time.
First, the road and rail travel across a long bridge. This bridge reaches an artificial island called Peberholm. This island was built by people in the middle of the strait. From Peberholm, the path goes underwater through the Øresund Tunnel. This tunnel leads to the Danish island of Amager.
Engineers chose a tunnel to keep the sky clear for planes. It also lets big ships pass through the water easily. This design helps prevent ice from blocking the path, too.
People have wanted a link here for a very long time. Ideas for a fixed path started in the late 1800s. In 1910, some people even suggested a railway tunnel. Later, in 1936, a group of firms proposed a motorway network. Many years passed with different plans and studies. In 1954, a group was picked to look into a bridge. By 1973, Denmark and Sweden finally agreed to build a link. However, an earlier plan was stopped in 1978 due to money and nature concerns. A new agreement was finally signed in 1991.
Building the bridge was a huge job that started in 1995.
Many people helped design it, including Jørgen Nissen and Klaus Falbe Hansen. A group called Sundlink Contractors won the job to build it. They used a giant crane barge named the Svanen. This crane was the largest in the world at that time. The bridge was finished in August 1999. It officially opened to everyone on 1 July 2000.
On that day, the leaders of Denmark and Sweden held a ceremony.
The bridge is built to be very strong and last a long time. It is designed to work for at least 100 years. It can handle very fast passenger trains and heavy freight trains. It must also stand up to high winds of 61 meters per second.
The bridge can even withstand hits from ships or earthquakes. Since it opened, many more people use it every day. Many people in Denmark now live in Sweden and travel across for work. It has changed how people move between these two countries.
The Øresund Bridge is a massive combined railway and motorway cable-stayed bridge.
It spans the Øresund strait, which separates Denmark and Sweden. This structure is the second longest bridge in Europe. It serves a vital role by connecting the Scandinavian Peninsula to mainland Europe. The bridge carries the international European route E20 for cars. It also carries the Øresund Line for trains.
Beyond transport, a data cable makes it a backbone for internet transmission between Sweden and central Europe.
The Øresund Link is a complex system of different parts.
It begins by running from the Swedish coast toward the middle of the strait. There, it reaches an artificial island called Peberholm. This island was created by people to connect the different sections. From Peberholm, the link changes from a bridge into the Øresund Tunnel. This tunnel travels underwater to reach the Danish island of Amager.
Engineers chose this specific design for several important reasons. A tunnel prevents the structure from interfering with air traffic from Copenhagen Airport. It also ensures a clear channel for ships and prevents ice floes from blocking the strait.
Designing the bridge required choosing between different routes and structures.
One option was a link between Helsingør and Helsingborg. However, planners decided to prioritize the connection between the major cities of Copenhagen and Malmö. The final design used a two-level approach. The ASO Group proposed a steel bridge with the highway on top and the railway below.
This design was selected over a concrete bridge design that placed both paths on the same level. The construction involved many different contracts for access bridges and the main span.
Ideas for a fixed link across the strait have existed for over a century. In the late 1800s, people began discussing ways to connect the lands. As early as 1910, proposals were made to the Swedish Parliament for a railway tunnel. In 1936, a group of engineering firms proposed a national motorway network. Various government commissions studied the project through the 1950s and 1960s. A formal agreement between Denmark and Sweden was signed in 1973, but it was cancelled in 1978. This cancellation happened because of the economic situation and environmental concerns. A new agreement was finally signed in 1991 to move forward.
Construction began in 1995 and was managed by Sundlink Contractors.
The project faced several unexpected challenges during this time. Workers discovered 16 unexploded World War II bombs on the seafloor. They also dealt with a tunnel segment that was accidentally skewed. Despite these setbacks, the link was finished three months ahead of schedule. The official dedication took place on 1 July 2000.
This ceremony was hosted by Queen Margrethe II of Denmark and King Carl XVI Gustaf of Sweden.
The bridge is built to meet extremely high safety and engineering standards. It is designed to have a lifespan of at least 100 years. The structure must withstand high wind speeds of 61 meters per second. The piers are designed to withstand collision forces of 210 MN. The spans must also withstand forces of 35 MN from collisions. The bridge can handle fast passenger trains and heavy freight trains. It must also remain stable during earthquakes. These strict requirements ensure the bridge remains safe for all users over many decades.
To build such a large structure, engineers used specialized tools. One decisive factor was the use of the Svanen, the world's largest hammerhead crane barge. Because the Svanen had such a large lifting capacity, engineers could increase the length of the spans. They increased the spans from the original plan to 140 meters. This allowed them to use fewer piers, which helped keep the water flow through the Sound unaffected. The project also used the Eurocodes, which were then new European standards for structural design. This helped different subcontractors from many countries work together effectively.
🖼️ Images & Media (19)
+ 7 more
More to explore
✨ What else?
Related topics you might enjoy
🪜 Step back
Simpler topics to build understanding
What is Nepedia?
A free, ad-free encyclopedia for children. Every article is written at five reading levels, so the same page works for a five-year-old and a fifteen-year-old — use the level switcher above to see this one change. No account needed to read.