Trains run under the city. 

Trains run under the city. 
The Istanbul Metro is a huge train system.
The system is very large. It has 160 stations in use. 
The Istanbul Metro is a massive railway network in Turkey.
How the system works depends on the city's unique geography. Istanbul is split by the Bosporus, a deep strait of water.
People have dreamed of a metro in Istanbul for a long time. 
Building the tracks was a very big job for engineers. 

Today, the metro is a busy part of daily life. Most lines run from 06:00 AM until midnight. Some lines, like the M5, are fully automated. This means they can run without a human driver. Passengers use a special card called the Istanbulkart to pay. The fare for a ride is 40 TL. Students can pay a lower rate of 20.08 TL. Some lines even offer service 24 hours a day on weekends. This makes traveling through the huge city much easier for everyone.
The Istanbul Metro is a massive rapid transit railway network serving Istanbul, Turkey.
The system's design must account for Istanbul's unique geography. The city is divided by the Bosporus, a deep strait of water.
Engineers used specific methods to ensure the system is safe and durable. They used the cut-and-cover method to build the network. This method helps the structures withstand significant seismic activity. The entire network is built to survive an earthquake of up to 9.0 on the Richter magnitude scale. Building the M2 line presented unique challenges for workers. During the drilling process, crews discovered many archaeological sites. These ancient historical sites slowed or stopped construction for many stations, particularly in the south. 
Istanbul has a very long history of underground rail. The Tünel is the oldest underground urban rail line in the city. It entered service on 17 January 1875. It is the world's second-oldest underground urban rail line. It was also the first underground urban rail line in continental Europe. Although it is a funicular, it paved the way for future plans. In 1912, a French engineer named L. Guerby proposed the first master plan. His plan, titled Avant Projet d'un Métropolitain à Constantinople, included 24 stations. Other planners like Henri Prost and Marc Langevin also proposed networks later. However, the modern mass transit system did not begin until 1989.
The M1 line was the first modern section to open. It began service on 3 September 1989. It was originally called "Hafif Metro," which means "light metro." This name came from its design. The M1 line uses shorter trainsets and shorter station platforms than a traditional metro.
Different lines have different technical capabilities and speeds. The M11 line is quite different from the others. It has a higher maximum speed of 120 km/h. It uses trains similar to Chinese metro type B trains. 
Daily travel on the metro is managed through a specific payment system. Passengers use the Istanbulkart, which is a universal contactless payment card. The standard flat fare is 40 TL. There are discounted rates for specific groups. Students pay 20.08 TL per ride. Teachers and senior residents pay 25.06 TL. The metro connects to many other transit types. This includes the Istanbul Tram, Metrobüs, and various cable cars. It also links to the F1, F2, F3, and F4 funicular lines. This creates a massive, interconnected web for the entire city.
🖼️ Images & Media (35)
+ 23 more
More to explore
✨ What else?
Related topics you might enjoy
🔬 Go deeper
More advanced topics to explore
🪜 Step back
Simpler topics to build understanding
What is Nepedia?
A free, ad-free encyclopedia for children. Every article is written at five reading levels, so the same page works for a five-year-old and a fifteen-year-old — use the level switcher above to see this one change. No account needed to read.